The Samsung AJ068TXJ3KG/EU requires specific clearances to ensure proper airflow and heat exchange. Failing to maintain these distances will reduce efficiency and risk system failure. Minimum 1500 mm of open space. Rear (Air Intake): Minimum 300 mm from the wall. Left Side: Minimum 300 mm for maintenance access.

Weigh in the extra R32 refrigerant using a digital scale through the liquid service valve while the system is dormant. 7. Commissioning and Test Running samsung aj068txj3kg eu installation manual

With mechanical, electrical, and refrigerant steps completed, you are ready to power on the system. Pre-Start Checklist All flare connections are torqued and leak-tested. The vacuum level achieved and held below 500 microns. Rear (Air Intake): Minimum 300 mm from the wall

Cut the copper pipes clean using a pipe cutter. Remove all burrs completely. Slip the flare nuts onto the pipe before creating the flare with an R32-rated flaring tool. Fixing the Outdoor Unit (Installation Step)

and Earth terminals on Indoor Unit A, B, and C respectively.

This section mirrors the flow of the . Perform all steps in sequence.

Do not install in laundry rooms, places with high salt content (coastal areas), or near flammable gas leaks. 2. Fixing the Outdoor Unit (Installation Step)