Before touching a single tool, the official dedicates 20% of its content to pre-installation checks. Ignoring these steps is the primary cause of system errors.

Strip the wires and connect them to the main terminal block: Line (L), Neutral (N), and Protective Earth (PE).

Connect the building’s Fire Alarm System to the dedicated safety input terminal.

[ MASTER CABINET ] <------- Lane Width -------> [ SLAVE CABINET ] +-------------------------+ +-------------------------+ | (x) [Conduit Entry] | | [Conduit Entry] (x) | | | ==== Infrared ==== | | | [Motor/Rotor] | ==== Sensors ==== | [Motor/Rotor] | | (x) (x) | | (x) (x) | +-------------------------+ +-------------------------+ (x) = Anchor Bolt Positions Step-by-Step Layout

Carefully uncrate the master (drive) cabinets, slave (receiver) cabinets, and center expansion cabinets (if deploying multi-lane configurations). gunnebo speedstile fl installation manual

Connect the reader feedback loops (Valid/Invalid card LED signals) if required. Emergency Fire Alarm Override

Perform these system validations before opening the lanes to the public:

Run the synchronizing communication cable through the under-floor conduit from the Master to the Slave cabinet.

Do not allow pedestrians into the lane until commissioning is complete. Initial Power-Up Checklist Before touching a single tool, the official dedicates

Installation of the Gunnebo SpeedStile FL requires a level, 150mm deep concrete foundation (minimum 30N/mm²) with precise alignment within +/- 5mm. Key steps include secure anchoring, proper conduit placement 140mm below the floor, and integration of access control via SG1 cards. For complete technical specifications and installation diagrams, review the Siel Invest manual . Gunnebo SpeedStile FLS Installation Guide | PDF - Scribd

Route the factory-supplied synchronization cable through the under-floor conduit from the Master cabinet to the Slave cabinet.

Draw a chalk line on the floor to mark the exact alignment of the units.

Shielded, twisted-pair data cables (typically LiYCY or Cat5e/Cat6 data cables) to link the optical transmitter and receiver arrays across the transit path. Connect the building’s Fire Alarm System to the

The finished floor must be concrete, perfectly level (within

The installation follows a sequential process to ensure physical stability and alignment.

Execute the following manual test cycles to ensure compliance with operational standards: Action Required Expected Behavior Present a valid badge to Reader A. Wings open smoothly; green arrow matrix illuminates. 2. Tailgating Two pedestrians attempt to pass on one badge.

+-----------------------------------------------------------------+ | GUNNEBO MAIN CONTROL BOARD | +-----------------------------------------------------------------+ | | | | [POWER IN] [INTER-UNIT] [ACCESS SYSTEM] [FIRE ALARM] 110V/230V AC Sync Cable Open/Close NC Contact (Master-Slave) Inputs (Dry) (Emergency) Power Input